SK hynix to Start 3D DRAM Production in 2031
What happened
Choi Kang-sik, a Distinguished Engineer at SK hynix, confirmed during the AI Semiconductor Forum at Seoul National University in Gwanak-gu that SK hynix plans to begin mass production of next-generation 3D DRAM by 2031. According to the presentation, SK hynix's roadmap indicates 3D DRAM production could start in 4 to 5 years, which would place the timeline at the latest in 2031. SK hynix estimates 3D DRAM would require approximately 75 memory layers to match the memory density of today's leading-edge 1c DRAM, which uses a 10 nm class design; considering other factors, the company aims to develop a 100-layer design as a first-generation product to ensure a significant advancement over the planar DRAM it has manufactured for years. Current equipment can reportedly handle 100 layers of 3D DRAM, but achieving 200 to 300-layer DRAM would require multi-deck stacking and specialized hybrid bonding techniques adapted from 3D NAND flash. SK hynix is expected to adopt this technology from Chinese company YMTC and license its Xtacking technology, which permanently bonds two silicon chips using embedded metal bumps; SK hynix plans to apply this 3D NAND flash technology to 3D DRAM. This is a plan/roadmap, and mass production has not yet begun.
Impact and signal
Affected components and suppliers
Source and time
Source: TechPowerUp · 11/25/2026 · View original source
Real-time pricing, supply signals and AI analysis for semiconductor traders